Scheduled .Name Production Maintenance

The .Name Production environment will be taken offline on Sunday, October 12,2008 UTC (Saturday, October 11, 2008 EDT) for a scheduled maintenance.

Date: Sunday, October 12, 2008 UTC (Saturday, October 11, 2008 EDT)
Time: 0100 hrs – 0500 hrs UTC (2100 hrs – 0100 hrs EDT)
Duration: 4 hours
Purpose: Routine Maintenance

  • Post category:calendrier